CHAPTER 8 |
|
|
ASPHALT PAVEMENT, BASES, AND SUBBASES |
|
|
|
|
|
8.00 |
TABLES AND REPORT FORMS |
|
8.01 |
TABLES FOR BITUMINOUS MATERIALS AND ASPHALT CONSTRUCTION |
|
8.02 |
REPORT FORMS |
|
|
Form Identification and Use |
|
8.10 |
ACCEPTANCE AND TESTING |
|
8.11 |
FIELD TESTS AND CERTIFICATION OF MATERIALS |
|
|
Asphalt Materials |
|
|
Aggregates |
|
8.12 |
RESPONSIBILITY AND DOCUMENTING ASPHALT MIXTURE PROPORTIONING CHANGES |
|
|
Adjusting Asphalt Binder Contents |
|
|
Documenting Corrective Action for Noncomplying Air Voids Test on Specimens Taken from Constructed Pavement |
|
|
Adjusting Aggregate Proportions |
|
8.13 |
DENSITY CONTROLS FOR ASPHALT CONSTRUCTION |
|
|
Uncompacted Asphalt Mixture Samples |
|
|
Compacted Asphalt Mixture Samples |
|
|
Procedures for Construction of Test Strips |
|
|
Resolving Density‑Void Conflicts |
|
8.14 |
TESTING FOR SMOOTHNESS |
|
|
Use of Straightedge |
|
8.15 |
CHECKING TRANSVERSE JOINTS FOR SMOOTHNESS |
|
8.20 |
MEASUREMENTS AND PAYMENT COMPUTATIONS |
|
8.21 |
ASPHALT BINDER |
|
|
Tank Measurement and Asphalt Binder Content Determination |
|
|
Measuring Asphalt Binder for Small Quantities |
|
|
Asphalt Binder Quantities and Pay Adjustments |
|
8.22 |
TARGET VALUES FOR ASPHALT BINDER CONTENT IN JOB MIXES |
|
8.23 |
WEIGHING OF ASPHALT MATERIALS |
|
8.30 |
EQUIPMENT USE AND INSPECTION |
|
8.31 |
INSPECTION AT ASPHALT PLANTS |
|
8.32 |
INSPECTING THE MIXING TIME OF ASPHALT PLANTS |
|
8.40 |
GENERAL CONSTRUCTION |
|
8.41 |
UNSTABLE SUBGRADES AND SUBBASES |
|
|
Locating Unstable Areas |
|
|
Determining Cause |
|
|
Overdepth Aeration and Recompaction |
|
|
Special Treatments |
|
8.42 |
STAKING METHOD FOR ASPHALT PAVEMENTS |
|
8.43 |
GUIDELINE STRINGS AND EDGE ALIGNMENT |
|
8.44 |
LONGITUDINAL JOINTS |
|
8.45 |
TACK COATS USING EMULSIONS |
|
|
For Dilution |
|
|
Application Rate for Diluted Emulsion |
|
|
Sample for Compliance |
|
|
Measurement for Pay |
|
|
Settlement of Diluted Emulsions |
|
8.50 |
BASE, INTERMEDIATE, AND SURFACE COURSES |
|
8.51 |
ASPHALT WEDGE CONSTRUCTION FOR SUPERELEVATION OF CURVES |
|
|
Automatic Slope Control |
|
|
Placement of Wedge |
|
|
Sequence of Placement |
|
8.52 |
LAYING WIDTHS FOR ASPHALT MIXTURES |
|
8.53 |
SPREAD RATES FOR ASPHALT BASE, INTERMEDIATE, AND SURFACE COURSES |
|
8.54 |
ASPHALT RESURFACING ON CITY STREETS |
|
|
Preliminary Layout |
|
|
Construction |
|
|
Thickness Taper at Curb Line |
|
|
Extending Paver Width |
|
8.55 |
COLD WEATHER ASPHALT CONSTRUCTION |
|
|
Temperature Determination for Placing Asphalt Mixtures and Liquid Bitumens |
|
8.56 |
RELEASE AGENTS AND SOLVENTS |
|
8.60 |
RUMBLE STRIPS IN ASPHALT PAVEMENTS |
|
8.61 |
MILLED SHOULDER RUMBLE STRIPS |
|
8.62 |
MILLED CENTERLINE RUMBLE STRIPS |
|
8.70 |
INSPECTOR’S GUIDE ‑ ASPHALT PAVING & RESURFACING |
|
|
Additional Requirements for Interstate Projects |
|
|
Additional Requirements for Full‑Depth Paving |
|
|
Additional Requirements for Winter Shutdown |
|
8.80 |
USE OF SPECIAL EQUIPMENT |
|
|
Material Transfer Vehicles |
|
|
Mat Smoothness Machine |
|
|
Windrow Pick‑up Equipment |